Brian Sander

…it transform from a fairly small number of technology companies to the massive center of technology that it is today. Throughout his career, he has been focused on System Design

Candace (Candy) Charity

…disk drives, involved in the design and simulation of a standard cell IC, oversaw the product design reliability program for two generations of 3½” disk drives and was the manufacturing…

Differences Among Majors

Computer scientists use and develop algorithms, information processing, computer languages, and computer systems to solve computing problems. For more information on computer science, visit the Department of Computer Science website….

2008-09 Distinguished Lecture Series

…in-depth courses for engineers, and less technical courses for non-engineers. Professor Comer is well-known for his series of groundbreaking textbooks on computer networks, the Internet, computer operating systems, and computer…

Cyber Infrastructure

…Mixed-Signal VLSI Design Center Computer Systems Laboratory Dependable Computing and Networking Laboratory Developmental Robotics Laboratory Digital Forensics Laboratory Discrete Event Systems Lab Embedded Systems Lab High-Speed Systems Engineering Laboratory Information…

2011 ECpE Alumni Award Honorees

…development began around 1982, and in 1984, Lee Ott was hired to complete the development. He designed the satellite uplink, wrote orbit tracking and user interface software, and was the…

List of Publications

…Venkat Krishnan, James McCalley, Santiago Lemos, and James Bushnell, “Nation-wide Transmission Overlay Design and Benefits Assessment for the U.S.,” Energy Policy, Jan 2013 – Available Online D. Wu and D….

Transformative Learning in ECpE

…a partnership between ISU’s Department of Electrical and Computer Engineering, Program for Women in Science and Engineering, Des Moines Area Community College (DMACC) and Kirkwood Community College. The initiative will…

Coover Hall History

…first and second floors were completed at that time. The third floor and auditorium were completed in 1951 and 1952, respectively. Transforming the High Bay Area In the 1990s, the…

Loading...